HOSPITALITY FORWARD LIVING

358 Class A units

SMX-8 Zoned, SDP recorded 2025

95% Construction documents

$14-15M Avoided AHO fees

THE PROJECT

Peña Station NEXT is a walkable, transit-oriented neighborhood built around the 61st and Peña A Line station, the first stop from Denver International Airport. Apartments, a 226-room Hyatt Place hotel and the planned Aviation Place retail street are within walking distance of the platform. Aviation Place ends at a 1.7-acre park with high-end streetscape already in place, positioned to become the social center of the submarket, with programmed events such as wine festivals and live music. DEN is now marketing two CMX-12 sites at Peña Station NEXT for hotel and office development. With the success of the Westin at the airport terminal and an international terminal expansion planned, the airport is preparing for more hospitality around the station.

ESTELLE is a 358-unit Class A community at 61st Avenue and Yampa Street. The site is zoned SMX-8, the site development plan was recorded in February 2025, and construction documents are at 95%. ESTELLE leads the sequence of 063's three Peña Station projects.

The building is designed to be hospitality oriented, with an entry courtyard, bar and lounge areas and work space for residents. Ground-floor retail sits at the southwest corner, oriented to the planned 1 million square feet of office. Townhomes and flats along 61st and Yampa have their own front doors and stoops. The north courtyards overlook Blue Grama Open Space, which connects to miles of trails and parks.

LOCATION + NEIGHBORHOOD

ESTELLE sits at 61st Avenue and Yampa Street, about half a mile from the 61st and Peña A Line station, with its north courtyards facing Blue Grama Open Space and its trail system. From the station it is 9 minutes to DEN, 14 minutes to RiNo and 25 minutes to Union Station.

  • United Airlines. United bought 113 acres at Peña Station in 2023 for its second flight training campus, with about 1.62 million square feet of office planned for about 6,200 employees. The land was rezoned in July 2026 and United expects to break ground in 2027.

  • Denver International Airport. One stop away on the A Line. DEN served a record 82.4 million passengers in 2025.

  • 16,000+ acres opening around DEN. DEN has more than 16,000 acres of non-aviation land available for commercial development. In August 2026 it began seeking master developers for the first 1,500 acres in four zones around the terminal, with $575 million to $735 million of infrastructure planned over 15 years.

  • Gaylord Rockies Resort & Convention Center. Colorado's largest hotel, with 1,501 rooms and 485,000 square feet of meeting space, has filed plans with Aurora to add about 450 more rooms.

PROJECT HIGHLIGHTS

  • Grandfathered from Denver's new affordable housing ordinance (AHO), an estimated $14-15 million in avoided linkage fees

  • Site development plan recorded February 2025

  • Construction documents at 95%

  • iGMP pricing from a Tier I, Class A general contractor

  • Located in a Treasury-certified Opportunity Zone 2.0 tract, with designations effective January 1, 2027

  • NGBS Silver certification targeted

  • 358 residential units: studio and studio+, one-bedroom and one-bedroom+, two-bedroom (including townhomes along 61st and Yampa) and three-bedroom

  • Ground-floor retail

  • Podium construction with structured, secured parking

  • Easy commute to DEN, RiNo and downtown

PROJECT TEAM

  • Brinkmann Constructors, general contractor

  • Holland Basham Architects, architect

  • Jirsa Hedrick Structural Engineers, structural engineer

  • Ware Malcomb, civil engineer

  • Anyone Collective, branding

  • MMG Real Estate Advisors, land valuation